Highway Engineering
Highway Engineering
Strengthening and widening of national and state highway stretches has become a major activity in the agenda of nation building and the CRAPHTS Consultants (I) Pvt. Ltd. has been making significant contributions in this area (both under NHDP and non NHDP). At present the Consultants are engaged for preparation of DPR for more than 300 kms. of National Highways at the instances of NHAI. Besides the CRAPHTS is presently working on drawing up the Master Plan for over 15,000 kms of National Expressway Network for India at the instance of the MoSRT&H.
Projects Undertaken :
A) Feasibility Study & DPR
- Consultancy services for preparation of Master Plan for National Expressway Network for India – Ministry of Shipping, Road Transport & Highways.
- Consultancy services for detailed Feasibility Study and preparation of Detailed Project Report for construction of new 6 lane link road (100m ROW) connecting NH8 & NH10 through Dwarka (30 kms.) – Delhi Development Authority
- Consultancy Services for preparation of Feasibility and detailed project report for Rehabilitation and upgrading of existing 2-lane road to 4-lane divided carriage way configuration from km 24.00 to km. 41.00 of Agra- Dholpur Section of NH-3 in the state of UP/Rajasthan under phase II programme of N-S & E-W corridor project.- NHAI
- Consultancy services for Feasibility Study and Detailed Project Report for Kanpur Bypass connecting NH-25 to Bhognipur on NH-2 under Phase - III programme of North – South and East –West corridors project (Contract Package No. C-III/31) – 34 kms. - NHAI
- Consultancy Services for Feasibility study and preparation of detailed project report for construction of new link road (Approach Road) from Dwarka Dwar to NH-8 through cantonment area in Delhi (6.11 k.m) including elevated corridor of 2147.5 m – Delhi Development Authority
- Consultancy services for feasibility and DPR for Nagpur – Mansar section of NH-7 (from km. 689.00 to km. 723.00) including Kamptee – Kanhan bypass (36.4 km) - NHAI
- Feasibility study and DPR for the project of improvements in radial roads connecting ORR and Ring Road in Hyderabad City (440 kms) – HUDA / HGCL
- Preparation of project report for Road no. 50 in Delhi (15 kms ) – PWD, Govt. of Delhi
- Feasibility Study for Chandigarh Bypass linking Ambala and Bharat Gargh (80 kms) – Punjab Urban Planning & Development Authority.
- Collection and computerization of Road Inventory data for 204 kms of PWD Roads in Delhi – PWD, Govt. of Delhi
- Feasibility Study and Project Preparation for 8-laning and corridor improvements of Ring Road between ITO and Azadpur (via Moolchand, Dhaula Kuan & Punjabi Bagh) including Road No.51, Road No. 50 (NH-1 Bypass), Road 26, GT Karnal Road and NH-1 spur in Delhi (64 kms.). – PWD, Govt. of Delhi
- Feasibility and project preparation for 6 laning and corridor improvement for the stretch of Outer Ring Road between Modi Mill and NH8 – PWD, Govt. of Delhi
- Consultancy services for feasibility study and preparation of Detailed Project Report for 4/6 laning of selected stretches of National Highways under 10,000 kms (NHDP Phase II) Programme, Contract Package No. NN/DL3/2: Khagaria – Begusarai – Bakhtiarpur section of NH-31 in the state of Bihar – length 120 kms. - NHAI
- Consultancy services for feasibility and preparation of Detailed Project Report for 4/6 laning of selected stretches of National Highways under 10,000 kms (PMBJP) Programme, Contract Package No. NN/DL2/2 : Tejpur – Helam section of NH-52 in the state of Assam –length – 123 kms - NHAI
- Uttarakhand Urban Development for Dehradun, Haridwar and Nainitial cities under JNNURM scheme – PWD, Govt. of Uttarakhand.
- Implementation Of Various Schemes / Infrastructure Development Work Under JNNURM Scheme In The State Of Haryana - Road & Urban Development Schemes For Faridabad – NBCC/FMC
- Implementation Of Various Schemes / Infrastructure Development Work Under JNNURM Scheme In The State Of Haryana – Storm Water Drainage Schemes For Faridabad - NBCC/FMC
B) Construction Supervision Services & Quality Control
- Construction supervision for 4-laning from km 24.00 to km 41.00 to Agra – Dholpur section of NH-3 in the state of Uttar Pradesh / Rajasthan under phase – II program of North – South and East – West corridors projects – length – 20 kms. - NHAI
- Construction Supervision for improvement and upgradation for 8 laning of Ring Road Moolchand and Punjabi Bagh via Safdarjung and Dhaula Kuan (24 kms.) – PWD, Govt. of Delhi
- Construction Supervision for improvement and upgradation 6 laning of Mall Road Extn. Between Azadpur and Mukarba Chowk of Ring Road Phase V between Punjabi Bagh to Azadpur - PWD, Govt. of Delhi
- Design & Implementation & Quality Control Of Bus Rapid Transit System (4 lane) In Visakhapatnam City (PTC & STC Corridors) – Total length – 38.60 kms.) – GVMC
C) Corridor Management & Routine Maintenance / Maintenance Audit
- Supervision of Improvement and Routine Maintenance Contract of sections on National Highways : (Package No.2-08: Kharagpur-Laxmannath-Balasore (Km 0.00 to Km 53.410 and Km 53.410 to Km 119.275) Section of NH-60 in West Bengal/Orissa) - NHAI
- Supervision of Improvement and Routine Maintenance Contract of sections on National Highways : (Package No.2-08: Kharagpur-Laxmannath-Balasore (Km 0.00 to Km 53.410 and Km 53.410 to Km 119.275) Section of NH-60 in West Bengal/Orissa) - NHAI
- Maintenance Audit of Pradhan Mantri Gram Sadak Yojana (PMGSY) works grouped under separate packages for Assam, Mizoram, Meghalaya and Orissa States - NRRDA